Marina Project

Location- QLD, Australia

Our Service- Design and certification structural systems of Marina including concrete deck pontoons, gangways, piles and pile brackets

Values added by us into the project – After damaging the whole marina due to storms, we were involved with design and certification of the whole marina. We carried out rigorous analysis and design to provide the most cost effective structural system and identified the strategically placed steel piles with the Elastomeric hingers can be used to improve the structural system of the marina while reducing the construction cost significantly and improving the constructability.

Singapore Marina Project 

Location- Singapore

Our Service- Design of a 100m long x 6m wide marina

Values added by us into the project- During the tender, the marina was proposed as a Aluminium framed structure supported by the form. We proposed as a concrete deck pontoon system providing high durability by reducing the cost significantly. This is a significant value added into the project.

Pontoons With Walkways

Location- QLD, Australia

Our Service- Design and certification of pontoons and walkways

Values added by us into the project- We carried out rigorous analysis and design to provide the most effective and structurally efficient system for the marina. We changed the structural system in order to improve the constructability since during the tender, it was identified that the structure system was not able to constructible.

Aluminuim Walkway

Location- Singapore

Our Service- Design of a 30m span walkways

Values added by us into the project- We provided a optimised structural system for the walkway structure by reducing 50% of the material proposed during the tender phase. Our rigorous analysis and design work used to design the walkways.

Gold Coast Marina

Location– QLD, Australia

Our Service– Design and certification structural systems of Marina including concrete deck pontoons, gangways, piles and pile brackets

Values added by us into the project– We were involved with design and certification of the whole marina. We carried out rigorous analysis and design to provide the most cost effective structural system and identified the strategically placed piles with the Elastomeric hingers can be used to improve the structural engineering system of the marina while reducing the construction cost significantly while improving the constructability.